ISS Daily Summary Report – 4/17/2023
Payloads: Electromagnetic Levitator (EML): Argon valves were closed and a Helium valve was opened in preparation for future science runs. The EML is a facility composed of four inserts installed into the European Drawer Rack (EDR) for the electromagnetic levitation of samples. The experiment samples are installed in a dedicated Sample Chamber that is attached …
Payloads: Electromagnetic Levitator (EML): Argon valves were closed and a Helium valve was opened in preparation for future science runs. The EML is a facility composed of four inserts installed into the European Drawer Rack (EDR) for the electromagnetic levitation of samples. The experiment samples are installed in a dedicated Sample Chamber that is attached …